2011年11月2日星期三

Moncler Jackets UKIllegally built villas are forced removal of misappropriation of public green spac

Yesterday, the community also Zhuangyi Dong houses illegally built a villa is part of the urban management department demolitions. The reporter Wujiang She also Zhuangyi Dong

house

yesterday morning, the house also Zhuangyi Dong district, a row of townhouses in the back yard, play with the excavator hammer raised to a two-story building, surrounding residents realized: this time chased illegally built the real thing.

demolitions of multi-sectoral styled scenes

9 am yesterday, an area outside the east gate of the house on the road, excavators, trucks, fire engines, ambulances,Moncler Jackets UK, etc. lined up, has entered the cell.

the District 3 area townhouse near the city inspectors wearing helmets cordoned off. BDA Branch is responsible for urban management in the security line command assignment, firefighters, police combat readiness.

ride in the backyard of private two-story building, than any other house out of about 5 meters, covering about 30 square meters.

elderly crowd singing to celebrate

cordon outside the alley, the owner Lee eagerly waiting to see. September 14, she has worked with more than 20 factory owners submitted a petition to the Development Zone, the removal of illegally built this place.

9 1155 hours in a

.

from August onwards, illegally built an outcrop, the owners have no complaints stopped.

12:10, two illegally built into a pile of brick rubble.

with the excavator bucket scoop up construction debris, poured into a large bucket truck, the cordon was opened.

owners in the crowd, an old man singing

inspectors led multi-sectoral linkage

early July this year, a house in Zone 3 of a townhouse for a But the owners did not expect, which is stamped with illegal construction start.

Liuwan day when Ms. Wang watched the house next to the sidewalk renovation workers dig out the bricks, and roadside green lights are on three overnight Before long, the original sidewalks and public green spaces are fence circle up,UGG Sale, became the owner of the garden.

leaving owners are angry that the villa was built in a two-storey building after building. The owners say, BDA Urban Management Bureau of the responsible person in the building and found evidence of their offense,Moncler Jackets, they first issued on August 12, does not match.

the responsible person, then, Urban Development Branch and the relevant departments to proceed to develop a variety of programs, including the overall work program, remove the assessment program, contingency plans, etc., Development Zone has also set up ten several related departments to participate in illegal building work leading group.

owners called on After emergence, the owners have followed suit.

one proposed by the owners of illegally built area, on the one hand owners should improve their own consciousness, can not be selfish, undermining the overall residential environment; the other hand, the relevant government departments should strictly enforce the law, such as a cell appeared in the first place illegally built, it shall be removed, since no one will be built.

a residential house property the responsible person, within the district without permission to build on the situation, there is currently no exact statistics. Settled residential property in September, Statistics sorting office is to leave the property data company, the next will be coordinated with relevant departments of the district without permission to build the case for a recount.

Zone urban branch of the responsible person, within the residential area there is demolition of illegally built home is difficult, hard evidence, difficulty in enforcement and other issues. The future will sum up experience, and consider other illegally built, step by step, reflecting the strong focus on residents and illegal on the seriousness of the illegal construction, illegal building gradually governance.

built 14 22 property owners submitted a joint petition to the Development Zone, want to remove illegally built

9 月 21 日 Development Zone sent to the owners' deadline for removal of decision, the removal of 30 months

10 月 22 日 10 of owners jointly, again to reflect the Development Zone

10 月 26 日 CMC sent again Related articles:

没有评论:

发表评论